Monthly Archives: March 2011

A Flattened Cost of Change Curve: An economic analysis

Much has been written about how a lowered cost of change curve is a benefit. And it certainly is a benefit. However, change is still costly, in terms of both time and money, even with this lowered cost of change. … Continue reading

Rate this:

Posted in .net, agile, c#, scrum, software architecture, xp | Tagged , , , , , , , , , | 7 Comments